Rear of house extension + decoration

June 5, 2017

GMB has recently completed this innovative & contemporary rear extension to this beautiful house.

 

The construction of this addition to the property  presented unique engineering difficulties in that we had to remove the bottom half of the rear flank wall without access to the 1st floor to be able to temporarily pin and support the upper floors, during installation of the substantial steel frame required to support this building.

 

 

 

The concealed zinc roof with hidden gutters was then installed from the new steel frame & the sliding glass wall was fitted to the new rear elevation.

 

Once the installation of the new underfloor heating system and tiling works were completed to the new kitchen area GMB were commissioned to carry out a complete external re-decoration.

 

 

New solid english oak doors cut and fabricated by one of our in house qualified and highly skilled joiners.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Please reload

Featured Posts

Chailey Heritage School - Summer works 2017

September 7, 2017

1/4
Please reload

Recent Posts

October 23, 2017

August 25, 2017

September 21, 2016

Please reload

Search By Tags
Follow Us
  • Facebook Classic
  • Twitter Classic
  • Google Classic